Project Description
Introduction
Project Name: Stonebridge and Willesden UTX and third and fourth rail removal
Date: August 2023
Customer Organisation: J Murphy and Sons
Site Location: Stonebridge and Willesden Station
GBR were contracted to install 1no utx and flume pipe at Stonebridge for new outfall, connecting to take all new drainage upgrade which was getting installed at the same time in the same 9 day blockade,
Outcomes
GBR were also tasked to cut and remove all third and fourth rail in Willesden station for JM Drainage works. This was going through the 6ft of the station when these works was complete. GBR Track gangs restates all third and fourth rail. The GBR supervisors then tampered in all locations for all lines, before handover. This was another great project that GBR undertook with great results for all.