Project Description
Introduction
Project Name: Stockport ACO Drainage, Copers & Tactiles
Customer Organisation: Neary Rail.
Customer Contact Details: Lewis Partington, Senior Project Manager
Life span of the platform was deteriorating dramatically where the Acos had collapsed which resulted in the platform flooding. The copers and tactile were also corroding at a rapid rate.
Scope of Works
- Remove the old Aco drainage system and replace with new Aco system with a large capacity water soakaway system across 400 metres of platform within a high street environment
- Replace like for like damaged copers and tactiles
Challenges
- With this being on a live platform with public interface we were limited on access and working space
- No open excavations were allowed even if chapter 8barriers were used
- Therefore, we had to remove and reinstate acos on the same shift and lay the trench covers/footpath boards to protect the newly set acos and tactiles
- Time constraints and track access were also an issue when laying of copers as gauging the copers under line blocks proved difficult